M24 Chaffee WIP Pictures查看: 幻灯片 平铺 名单 1March 13, 2021Subassembly complete. The metal barrel included in the kit was a nice touch. 2March 13, 2021Drilling out the metal track links 3March 13, 2021Lots of little bits 4March 13, 2021The metal links have an excellent fit, pretty surprising actually. 5March 13, 2021Starting to come together, the fully moving aspect of these tracks is pretty amazing 6March 13, 2021Both tracks done, ready for burnishing. 7March 13, 2021M2 browning with an added detail set from Aber. I didn't bother with swapping out every PE bit that was included. 8March 13, 2021I just chose the major details to replace in PE, and it turned out great. 9March 13, 2021Hull and turret preshaded. Ready for basecoating. 10March 13, 2021 评论24 November 2024, 03:15 - Project infoWW2 M24 Chaffee10 图片1:35进行中所有相册查看所有相册 »