Astrakhan Buyan Class Corvette Project 21630
1
January 28, 20202
January 28, 20203
January 28, 20204
January 28, 20205
January 29, 20206
January 29, 20207
January 30, 20208
January 30, 2020Glued both halves... I knew there was a difference in length, but in width to... more then 1 mm gap between certain parts of lower and upper hull...9
January 30, 2020more then 1mm in length too... stern looks different then10
January 30, 2020real situation11
January 30, 2020real situation12
January 30, 202013
January 31, 2020Bitten the bullet14
January 31, 2020dryfit15
January 31, 2020and glued... so it takes 24h to dry.. then putty time...16
January 31, 2020ready for checking with paint17
January 31, 2020ready for checking with paint18
January 31, 2020ready for checking with paint19
January 31, 2020ready for checking with paint20
February 6, 2020last check21
February 6, 2020last check22
February 7, 2020after carving slots where the glue kept protruding and filling them, seems it gave the result I was after23
February 7, 2020after carving slots where the glue kept protruding and filling them, seems it gave the result I was after24
February 11, 2020something off... main part should consist of 2 parts, molded as one, PE-part doesn't fit over it25
February 11, 2020to avoid as much attachments points, I cut my PE at an angle, as close as possible to the part26
February 11, 2020then I put it between some toothless pliers27
February 11, 2020sand it flush all around28
February 11, 2020then some careful cutting, and voila, first weapon ready29
February 14, 2020a lot of small parts to add30
February 14, 2020doors and details added31
February 14, 2020antenna busy to be built up32
February 14, 2020antenna busy to be built up33
February 14, 2020general overview34
February 14, 2020inlet for the turbines, guards still to be added
评论
9 April 2025, 10:04 -