SIAI-Marchetti SF-260M查看: 幻灯片 平铺 名单 1May 10, 2019 2April 16, 2019a little detail to the interior. Just scraping away some excess resin... 3April 30, 2019Mated the hull sides, the wings and the tail. When mating the hull to the main wings, there was a little difference in width. So i glued the front and back first, added a spacer in the middle before gluing those 4April 30, 2019No large gaps here 5April 30, 2019Some cleaning up on these edges, but need to check with some primer. The squares in front of the nose need to be replaced 6April 30, 2019Some cleaning up on these edges, but need to check with some primer. The squares in front of the nose need to be replaced 7May 3, 2019first I drill some holes 8May 3, 2019from some copper rod I make a needle (just make a point with a file) 9May 3, 2019make it protrude just a bit and position the part over it. When the position is ok, just press... 10May 3, 2019and you have an indent where to drill next. Then add a rod in the hole for positioning, and repeat for the other hole. 11May 3, 2019all "perfectly" aligned and strengtened, it is still me, so ahum... 12May 10, 2019Nose fitted, a little bit to small in 3 directions 13May 10, 2019Filled and sanded 14May 10, 2019Filled and sanded 15May 10, 2019Filled and sanded 16May 20, 2019the border over the IP was very thin and fragile, also some parts were missing 17May 20, 2019removed the details, made a new top from paper, and added the details again 18May 22, 2019Vacformed front canopy cut out, and ready to detail... 19May 22, 2019Vacformed rear canopy cut out, and ready to detail... 20May 22, 2019a bit of corrections to the tub... 21May 22, 2019the other side 22May 22, 2019new front landing gear cover 23May 24, 2019rubber sealing added 24May 24, 2019main canopy detailed, still the handles for opening/closing to add 25May 24, 2019main canopy detailed, still the handles for opening/closing to add 评论14 November 2024, 12:36 - Project infoSIAI-Marchetti SF-260M25 图片1:48想法所有相册查看所有相册 »