Revell 1/200 Titanic Searcher Le Suroit construction 查看: 幻灯片 平铺 名单 1April 19, 2018Drilling out bow thruster openings 2April 19, 2018Connecting bow thruster holes with evergreen tube 3April 19, 2018Milliput was used to attach the thruster tube 4April 19, 2018Bow thruster hole ready for an actual thruster (still to be made) 5April 19, 2018Deck 1 gets started. 6April 19, 2018Hull halves being glued, rear deck maked 7April 19, 2018Deack 1 and hull painted. Painted boot line rather than decal provided in the kit 8April 19, 2018 9April 19, 2018Main mast. Making radio loops out of wire. 10April 19, 2018 11April 19, 2018Masking the boot line at the stern was tricky 12September 25, 2018 13September 25, 2018 14September 25, 2018 15October 6, 2018Progress. Lots still to do! 16October 19, 2018Prop and pleuger rudder attached 17November 4, 2018Scratch built bow thruster painted. It will fit into the thruster tunnel I made. 18November 4, 2018Cyana submersible completed. Not sure if blackwash was OTT but it looks OK. 19March 10, 2019Scratch built Bow thruster from port side 20March 10, 2019Scratch built Bow thruster from starboard side 21March 10, 2019 22April 15, 2019Aber PE railings going on 23April 15, 2019Aber PE railings going on 24April 15, 2019DIY perspex display case. 2mm perspex. Custom wood base off ebay 25April 15, 2019New plinths made from 9mm alu rod and brass 2mm rod. 评论24 November 2024, 06:38 - Album infoConstructionTitanic Searcher "Le Suroît"43 图片1:200已完成RV Le Suroît IFREMERLe Suroït1985 RMS Titanic expedition 所有相册查看所有相册 »