Astrakhan Buyan Class Corvette Project 21630Visa: Bildspel Mosaik Lista 1January 28, 2020 2January 28, 2020 3January 28, 2020 4January 28, 2020 5January 29, 2020 6January 29, 2020 7January 30, 2020 8January 30, 2020Glued both halves... I knew there was a difference in length, but in width to... more then 1 mm gap between certain parts of lower and upper hull... 9January 30, 2020more then 1mm in length too... stern looks different then 10January 30, 2020real situation 11January 30, 2020real situation 12January 30, 2020 13January 31, 2020Bitten the bullet 14January 31, 2020dryfit 15January 31, 2020and glued... so it takes 24h to dry.. then putty time... 16January 31, 2020ready for checking with paint 17January 31, 2020ready for checking with paint 18January 31, 2020ready for checking with paint 19January 31, 2020ready for checking with paint 20February 6, 2020last check 21February 6, 2020last check 22February 7, 2020after carving slots where the glue kept protruding and filling them, seems it gave the result I was after 23February 7, 2020after carving slots where the glue kept protruding and filling them, seems it gave the result I was after 24February 11, 2020something off... main part should consist of 2 parts, molded as one, PE-part doesn't fit over it 25February 11, 2020to avoid as much attachments points, I cut my PE at an angle, as close as possible to the part 26February 11, 2020then I put it between some toothless pliers 27February 11, 2020sand it flush all around 28February 11, 2020then some careful cutting, and voila, first weapon ready 29February 14, 2020a lot of small parts to add 30February 14, 2020doors and details added 31February 14, 2020antenna busy to be built up 32February 14, 2020antenna busy to be built up 33February 14, 2020general overview 34February 14, 2020inlet for the turbines, guards still to be added Kommentarer29 December 2024, 08:00 - Project infoAstrakhan Buyan Class Corvette Project 2163034 bilder1:350PågåendeAll albumsView all albums »