Hasegawa Ju87 / Dual Stuka Build - WIP
Коментари
6 4 September 2021, 23:04
John
Comparing both kits, they seem very solid and straight forward. There are a few obvious corrections that I have noticed: 1. The control surface actuators on the wings are poorly molded and will need to be replaced; 2. The area behind the engine radiator looks to be a hollow cavity and will need to be closed with some basic detail; and 3. There is almost no rivet detail. I am looking forward to trying out my Rosie the Riveter rivet tool on this build.
Comparing both kits, they seem very solid and straight forward. There are a few obvious corrections that I have noticed: 1. The control surface actuators on the wings are poorly molded and will need to be replaced; 2. The area behind the engine radiator looks to be a hollow cavity and will need to be closed with some basic detail; and 3. There is almost no rivet detail. I am looking forward to trying out my Rosie the Riveter rivet tool on this build.
15 September 2021, 02:21
Album info
I have had the G-2 and B-2 kits in my stash since 1999 - it's past time to get them on the display shelf. My first try building two kits at once; it should be pretty straight forward as they are very similiar.