Revell 1/200 Titanic Searcher Le Suroit construction
1
April 19, 2018Drilling out bow thruster openings2
April 19, 2018Connecting bow thruster holes with evergreen tube3
April 19, 2018Milliput was used to attach the thruster tube4
April 19, 2018Bow thruster hole ready for an actual thruster (still to be made)5
April 19, 2018Deck 1 gets started.6
April 19, 2018Hull halves being glued, rear deck maked7
April 19, 2018Deack 1 and hull painted. Painted boot line rather than decal provided in the kit8
April 19, 20189
April 19, 2018Main mast. Making radio loops out of wire.10
April 19, 201811
April 19, 2018Masking the boot line at the stern was tricky12
September 25, 201813
September 25, 201814
September 25, 201815
October 6, 2018Progress. Lots still to do!16
October 19, 2018Prop and pleuger rudder attached17
November 4, 2018Scratch built bow thruster painted. It will fit into the thruster tunnel I made.18
November 4, 2018Cyana submersible completed. Not sure if blackwash was OTT but it looks OK.19
March 10, 2019Scratch built Bow thruster from port side20
March 10, 2019Scratch built Bow thruster from starboard side21
March 10, 201922
April 15, 2019Aber PE railings going on23
April 15, 2019Aber PE railings going on24
April 15, 2019DIY perspex display case. 2mm perspex. Custom wood base off ebay25
April 15, 2019New plinths made from 9mm alu rod and brass 2mm rod.
Komentáre
7 April 2025, 17:03 -
Album info
Construction
43 snímky