HMS Revenge departing FaslaneПосмотреть: Слайд-шоу Мозаика Список 1September 16, 2022After building and priming the sub, I attacked a block of high-density foam with a DIY foam cutter to settle the sub in the water. 2September 16, 2022Used the standard foil, paper and mod-podge technique for creating the sea surface and wake 3September 16, 2022Masked the sub for completing the water in-situ 4September 16, 2022I built up the water with layers of gloss mod-podge and airbrushed colouring 5September 16, 2022Wake was built up with cotton wool, touched up with Vallejo Model Color white. Wash and wave tops are highlited with some Deluxe Scenic Snow 6September 16, 2022A made a simple bass wood frame for display.. 7September 16, 2022 8September 16, 2022 9September 16, 2022 10September 16, 2022 11September 16, 2022 Комментарии6 November 2024, 04:41 - Project infoHMS Revenge departing Faslane11 изображения1:700ЗавершённыеHMS Revenge (S27) Royal Navy (1546-now) Все альбомыПосмотреть все альбомы »