Grumman S-2E Tracker Voir: Diaporama Mosaïque Liste 1October 25, 2020 2October 25, 2020 3October 25, 2020 4October 25, 2020Starting with inner parts of the wings and engines 5October 25, 2020Well.. plastic card is needed to fill the huuuge gaps... 6October 25, 2020Plastic card again. Upper exhausts drilled. 7October 27, 2020On the port engine: scoop nerfs to be replaced, from starboard to port side. 8October 25, 2020Seams... 9October 27, 2020Scratched exhausts in place. 10October 27, 2020Dry fitting: not so bad. Wings may be installed after paintjob. 11November 4, 2020Scratching the missing light on the port wing... 12November 4, 2020Scratching the missing light on the port wing... 13November 4, 2020Scratching the missing light on the port wing... 14November 4, 2020Scratching the missing light on the port wing... Done ! 15November 5, 2020Wings almost finished, with the resin pylons in place (QB). Need to scratch the search light... 16November 5, 2020Quickboost scoops installed. 17November 8, 2020Scratching the search light... 18November 8, 2020 19November 8, 2020Search light completed 20November 11, 2020 21November 19, 2020 22November 19, 2020 23November 19, 2020 24November 19, 2020Cockpit ready for paint ! 25November 23, 2020Cockpit’s PE... in progress ! 26November 29, 2020Cockpit’s parts are painted in FS36170 (mix of Tamiya), and details are made with painted decal stripes. 27November 29, 2020Cockpit in progress... 28December 1, 2020 29December 1, 2020 30December 5, 2020 31December 5, 2020Micro Kristal Klear 32December 8, 2020Checking the fitting of the clear parts. Need to sand a little bit, and to modify the rear lower angle. 33December 8, 2020Dry fitting... much better ! 😉 34December 12, 2020Installing the cickpit in the left half fuselage, fittings are quite touchy ! 35December 12, 2020 36December 15, 2020Lead ballast: 50 grams! 37December 23, 2020 38December 12, 2020 39December 23, 2020 40December 23, 2020 41December 23, 2020 42December 23, 2020 43December 23, 2020 44December 30, 2020Reducing the length of the engines bases 45December 30, 2020Detailing job completed 46December 30, 2020Detailed engine... dry fitting : check ! 47January 5, 2021Black Surfacer 1500... 48January 2, 2021Homemade tail antennas (VOR)... tiny bits of plastic card and micro tubes.. 49January 5, 2021Alclad Dark Aluminium on the cylinders... 50January 8, 2021Engines painted and weathered. 51January 8, 2021 52January 12, 2021Adding the bays, where the struts supporting the wings will be located 53January 14, 2021I was not happy with my first attempt to reproduce the VOR antennas... so, new try with a different method (on the left side). 54January 16, 2021 55January 12, 2021Adding the antennas: ILS (chin) and VHF (below)... The exhaust of the heating system has been erased and replaced. 56January 23, 2021Help needed: looking for a better view of this part... (edit: found !) and BTW, what is it made for ? 😉 57January 25, 2021 58January 25, 2021 59June 6, 2021Back on the workbench after nearly 4 month... what the hell is the next phase ?!! 🙂 Commentaires5 October 2024, 08:27 - Project infoGrumman S-2E Tracker59 images1:48En cours2+Grumman S-2E Tracker Comando de Aviación Naval Argentina (Argentine naval Aviation 1916-now)Esc. Aeronaval Antisubmarino 152829/2-AS-22Avril 1982 Falklands War - Puerto Argentino (Islas Malvinas) Tous les albumsVoir tous les albums »