F4U-1D Corsair
Reference for the riveting job…
Reference for the riveting job…
Starting with the engine: Vector and quickboost sets will improve the detail level of this area.
(left: Tamiya / right: modifying the kit parts)
(left: Tamiya / right: modifying the kit parts)
Reference picture.
Bending a section of rectangular Evergreen
Push rods and ignition ring are glued in place.
The drop tank is completed, with little details added (plastic card and a curved needle).
Messing around the moto tug included in the box… adding some details and bits on the engine. Need to scratch the radiator now…
Adding the scratched radiator and exhaust line.
Dry fitting… checked !
Comentarios
20 10 July 2023, 10:45
Hanno Kleinecke
Cowlflaps and mechanism look fantastic ! No clue that this Vector set existed
Cowlflaps and mechanism look fantastic ! No clue that this Vector set existed
10 July 2023, 13:59